Avoidance of Unexpected Downtime for Critical Turbine on an Offshore Platform

29 January 2025

Fluitec’s ESP leads to a reduction in bearing temperatures

PROBLEM

oil rig
Bearing temperatures on a critical Solar Taurus 70 Turbine in an Offshore Platform began to increase rapidly and the MPC values climbed into the Monitor range.

These values triggered fears of an untimely shutdown of the unit which would cause major delays.

SOLUTION

Fluitec’s ESP unit was installed and within one month the MPC values returned to the normal range and the temperatures dropped into regular operating values.

RESULTS

  • Decline in MPC (from 22 to 10) after installation of ESP unit
  • MPC levels maintained the normal range < 10
  • Bearing temperatures returned to regular levels
  • No unexpected downtime or reduction in availability

oil rig drill

CASE STUDY

 

CLIENT: Offshore Platform
COUNTRY: Australia
APPLICATION: Solar Gas Turbine
COST SAVINGS: $2.5M
OIL SAVINGS: 700 gals / 2,650 liters
SOLUTION: ESP

Other blog posts
Wire Rope Grease, Lubricant Types: Penetrating vs Coating Greases Explained
29 November 2025

In Part 1 of our wire rope lubrication series, we explored why proper lubrication is critical and the three essential […]

Wire Rope Lubrication: Why Proper Lubrication is Critical 2025 Guide
29 November 2025

Wire rope is the backbone of countless industrial operations—from construction cranes and mining equipment to elevators and suspension bridges. Yet […]

Emission Reduction: Strategic Framework for Sustainable Industrial Operations
11 November 2025

In an era where climate action has shifted from optional initiative to business imperative, emission reduction represents one of the […]

Wire Rope Lubrication: Complete Guide to Extending Rope Life and Preventing Failure
11 November 2025

Wire rope is the backbone of countless industrial operations—from construction cranes and mining equipment to elevators and suspension bridges. Yet […]

Scroll to Top