Avoidance of Unexpected Downtime for Critical Turbine on an Offshore Platform

29 January 2025

Fluitec’s ESP leads to a reduction in bearing temperatures

PROBLEM

oil rig
Bearing temperatures on a critical Solar Taurus 70 Turbine in an Offshore Platform began to increase rapidly and the MPC values climbed into the Monitor range.

These values triggered fears of an untimely shutdown of the unit which would cause major delays.

SOLUTION

Fluitec’s ESP unit was installed and within one month the MPC values returned to the normal range and the temperatures dropped into regular operating values.

RESULTS

  • Decline in MPC (from 22 to 10) after installation of ESP unit
  • MPC levels maintained the normal range < 10
  • Bearing temperatures returned to regular levels
  • No unexpected downtime or reduction in availability

oil rig drill

CASE STUDY

 

CLIENT: Offshore Platform
COUNTRY: Australia
APPLICATION: Solar Gas Turbine
COST SAVINGS: $2.5M
OIL SAVINGS: 700 gals / 2,650 liters
SOLUTION: ESP

Other blog posts
Diesel Emissions Compliance: What UK Fleet Operators Need To Know About Euro 6 And Beyond
30 September 2026

If your fleet meets Euro 6 type approval, it’s reasonable to assume you’re covered when it comes to emissions compliance. […]

How Rising Fuel Prices Are Making Fuel Efficiency Technology Essential For Fleet Operators
28 September 2026

Fuel prices have rocketed in recent months thanks in no small part to the US-Iran conflict and the stranglehold on […]

How Sulnox Eco Fuel Conditioner Is Helping UK Construction Fleets Reduce Fuel Costs And Emissions
24 September 2026

Fuel accounts for 20% to 30% of plant hire operating costs, often more depending on the mix of equipment in […]

Wire Rope Safety Inspections: What Maintenance Teams Need To Check Before Every Lift
18 September 2026

Official Lifting Operations and Lifting Equipment Regulations (LOLER) guidance confirms the statutory duties that apply to lifting equipment, including the […]

Scroll to Top