PROBLEM

Bearing temperatures on a critical Solar Taurus 70 Turbine in an Offshore Platform began to increase rapidly and the MPC values climbed into the Monitor range.
These values triggered fears of an untimely shutdown of the unit which would cause major delays.
SOLUTION
Fluitec’s ESP unit was installed and within one month the MPC values returned to the normal range and the temperatures dropped into regular operating values.
RESULTS
- Decline in MPC (from 22 to 10) after installation of ESP unit
- MPC levels maintained the normal range < 10
- Bearing temperatures returned to regular levels
- No unexpected downtime or reduction in availability

CASE STUDY
CLIENT: Offshore Platform
COUNTRY: Australia
APPLICATION: Solar Gas Turbine
COST SAVINGS: $2.5M
OIL SAVINGS: 700 gals / 2,650 liters
SOLUTION: ESP